Added to demo agenda!
Talk to our team to learn how Cassidy can help your team with this use case

AI Change Order Letter Drafting Agent

Change order letter drafting automation for construction field engineers—AIA-ready, clause-mapped, e‑sign routed
Overview
Industrials
Workflow

Automating Change Order Letter Drafting with AI

Automate your entire change order letter drafting workflow—from field documentation capture through clause mapping, pricing assembly, and e-signature routing.
001
Contract-Compliant Documentation from Day One

The agent maps every scope element to specific AIA A201 clauses and underlying documents—RFIs, ASIs, CCDs, bulletins, and spec sections—ensuring each change order package meets contractual notice requirements and stands up to audit.

002
Pricing and Schedule Impact Built In

Automated workflows compile labor, equipment, materials, and subcontractor quotes into detailed cost breakdowns with OH&P markups per contract caps, while generating fragnet-based schedule impact narratives tied to critical path activities.

003
E-Sign Routing with Full Audit Trail

Once the AIA G701 form and supporting exhibits are assembled, the system routes for electronic signatures in the correct sequence—Architect, Contractor, Owner—capturing timestamps and version control for a complete approval record.

How Cassidy automates change order documentation using AI

Step 1: Trigger on change event identification

The Workflow activates when a change event enters the system—whether from an RFI clarification, Architect's Supplemental Instruction, Construction Change Directive, differing site condition report, or field-captured T&M ticket.

Step 2: Ingest and organize field documentation

Cassidy pulls relevant artifacts from your Knowledge Base and connected systems: contract documents (AIA A201, prime agreement exhibits), prior change orders, drawings with delta revisions, T&M tags, daily logs, photos, and vendor quotes.

Step 3: Map scope to contract clauses and documents

The Agent analyzes the change event and maps each scope element to specific AIA clauses (§7 for changes, §15 for notice/claims), drawing sheets, spec sections, and reference documents—flagging notice windows and required sign-offs.

Step 4: Generate clause-mapped change order letter

Cassidy drafts a complete change order cover memo with executive summary, detailed scope narrative (inclusions/exclusions), contractual basis, pricing summary tied to cost codes and SOV, schedule impact statement, and a checklist of attachments.

Step 5: Auto-populate AIA G701 form

The Workflow populates the AIA G701 Change Order form with project details, CO number, scope description, net change to Contract Sum, adjusted totals, Contract Time adjustments, and new Substantial Completion date—producing a locked PDF ready for execution.

Step 6: Assemble pricing and schedule exhibits

Cassidy compiles the detailed cost breakdown—labor with burdens, equipment rates, materials, subcontractor quotes, extended general conditions, and OH&P per contract caps—alongside a fragnet or narrative schedule impact exhibit with requested time extension days.

Step 7: Validate completeness and prevent errors

Before routing, the Agent runs a QA checklist: verifying T&M sign-offs are complete, checking for double-counting against existing PCOs, confirming alignment to cost codes and SOV, and flagging any missing backup documentation.

Step 8: Route for e-signature in contract sequence

Cassidy sends the assembled package through your e-sign platform (DocuSign, Adobe Sign) with ordered signers per contract requirements, attaching all exhibits and capturing a timestamped audit trail.

Step 9: Update project controls and downstream systems

Once executed, the Workflow pushes the change order values to your change log, budget, prime contract, subcontractor change orders, pay applications, and schedule controls—keeping ERP and project management systems synchronized.

Implement it inside your company

Get help from our team of specialists to quickly integrate this solution into your existing workflow and unlock new growth.
Book Demo
  • Hands-on onboarding and support
  • Self-paced training for your team
  • Dedicated implementation experts
  • Ongoing use case discovery
  • ROI tracking & analytics dashboards
  • Proven playbooks to get started fast

A dedicated team to drive adoption and results

Our implementation experts work hands-on with your team to make sure you see real value - fast. From setup to optimization, we’re here to help every step of the way.

We enable your teams - no IT required

We train your builders, support their workflows, and make sure they get the most out of Cassidy without ever waiting on engineering.

Explore more Industrials automations

Move from idea to production with Cassidy